Hi all
Is it possible to switch data source in Analysis Office, similar to what one can do in BEx Analyzer?
I.e. when I build an analysis, tell the system to disconnect from the existing data source, and start using a new one (e.g. switch from production support system to production system) and then refresh based on the new system's data?
Many thanks for your input
Bart